Skip to main content
Past Blog Log

Timeline and searchable index

Explore the generated RABS/admin historical series by date, season, tag, or keyword, with feature arc labels shown on each card. Counts are sourced from the final generation ledger and retrospective.

Generated posts2827 chronology + retrospective
Session coverage186/325117 represented, 69 grouped
Date range2025-09-27 to 2026-05-01100 unique session dates
Skipped/excluded139134 empty, 1 unclear, 4 duplicate forks
Historical arcs13plus final retrospective
Supplemental docs used11/1120 public image posts
Showing 28 of 28 generated posts.

September 2025

27 September 2025
Post 1Arc 1

Admin Navigation and User Foundations

Early admin navigation, authentication, user handling, and the first durable shell decisions.

27 September 20252025-09-27 to 2025-09-299 ledger session references

October 2025

1 October 2025
Post 4Arc 2

Vite Source Admin Rebuild

The admin frontend moved toward source-managed, Vite-built pages without turning into a single-page app.

1 October 20252025-09-30 to 2025-10-059 ledger session references
6 October 2025
Post 5Arc 3

HR, Reggie, and Admin Frontend Expansion

HR surfaces, Reggie pages, settings modules, and wider admin frontend expansion came into view.

6 October 20252025-10-06 to 2025-10-0810 ledger session references
9 October 2025
Post 6Arc 3

Logging, Notifications, and Settings

Logging, notification delivery, email investigation, and settings reliability became the main friction points.

9 October 20252025-10-09 to 2025-10-1514 ledger session references
16 October 2025
Post 7Arc 4

Profiles, File Manager, and Task System

Profile pages, file-manager repair, task-system expansion, and expense-report direction moved together.

16 October 20252025-10-16 to 2025-10-2511 ledger session references
26 October 2025
Post 8Arc 4

Forum, Email Crisis, and DB2 Cutover

Forum fixes, email instability, communications planning, and the progressive DB2 cutover overlapped.

26 October 20252025-10-26 to 2025-11-0413 ledger session references

November 2025

6 November 2025
Post 2Arc 5

Recovery-Driven Admin and Backdoor Porting

Recovery work, notification repair, and backdoor porting turned failures into a safer migration path.

6 November 20252025-11-06 to 2025-11-1911 ledger session references
20 November 2025
Post 9Arc 6

DB2 Cutover, Calendar Routing, and Email 3.0

DB2 endpoint work, calendar routing, and Email 3.0 planning pushed through resets and partial states.

20 November 20252025-11-20 to 2025-11-266 ledger session references
22 November 2025
Post 10Arc 6

HR Ops, Contract Hub, Council, and Policy Studio

HR operations, contract flow, council tooling, and policy drafting were shaped as connected work.

22 November 20252025-11-22 to 2025-12-058 ledger session references

December 2025

9 December 2025
Post 11Arc 7

Admin Directory and Org-Chart Layout

The admin directory and organization-chart layout were grounded in hierarchy, reveal, and asset-serving realities.

9 December 20252025-12-09 to 2025-12-091 ledger session reference
16 December 2025
Post 12Arc 7

Staff Files v2 Backend and Document Flows

Staff file architecture and document workflows were mapped without overstating Monday-sync completion.

16 December 20252025-12-16 to 2025-12-192 ledger session references
22 December 2025
Post 13Arc 7

Email Ops Monitoring and Dual-Schema Audit

Monitoring, queue visibility, mailbox health, and dual-schema concerns took focus at year end.

22 December 20252025-12-22 to 2025-12-221 ledger session reference

February 2026

8 February 2026
Post 14Arc 8

Type 2 Agents Return

Type 2 agent work returned with broker routes, runtime shape, and the first successful tool-call thread.

8 February 20262026-02-08 to 2026-02-081 ledger session reference
21 February 2026
Post 15Arc 8

Email Agent Routing and Four-Agent Chat Planning

Email-agent routing, switch architecture, prompt upgrades, and four-agent chat planning were tied together.

21 February 20262026-02-21 to 2026-02-282 ledger session references

March 2026

5 March 2026
Post 16Arc 9

Messenger Fixes and Catch-Up Surveys

Messaging repair, lost-context recovery, catch-up surveys, and KPI workflow expansion framed the period.

5 March 20262026-03-01 to 2026-03-103 ledger session references
12 March 2026
Post 17Arc 9

File Manager and Media Groundwork

File-manager state, shared asset handling, media foundations, and permission hardening moved forward.

12 March 20262026-03-12 to 2026-03-303 ledger session references
28 March 2026
Post 18Arc 9

Deputy/Xero Payroll Migration Pivot

Payroll direction pivoted around Deputy, Xero, staff-finance needs, and migration limits.

28 March 20262026-03-28 to 2026-03-295 ledger session references
31 March 2026
Post 19Arc 9

Finance Billing Worker Batch

Finance and billing frontend surfaces were advanced through an audit-grounded worker batch.

31 March 20262026-03-31 to 2026-03-314 ledger session references

April 2026

1 April 2026
Post 20Arc 10

TokenWatch, Docs, Scheduling, and Storage-Agent Quality

TokenWatch, documentation cleanup, scheduling work, and storage-agent quality were handled as triage-heavy work.

1 April 20262026-04-01 to 2026-04-0719 ledger session references
8 April 2026
Post 3Arc 11

File Manager, Participant Files, and Type2 Broker Tools

Access control, participant files, payroll-adjacent work, and Type2 broker tools converged in one run.

8 April 20262026-04-08 to 2026-04-108 ledger session references
14 April 2026
Post 21Arc 12

Mapping the Shift-Note Stack

Shift-note, AI-infrastructure, and UI/schema groundwork were mapped as research rather than shipped completion.

14 April 20262026-04-14 to 2026-04-143 ledger session references
19 April 2026
Post 22Arc 12

Docs Audit, TokenWatch Reality, and the Email AI Pivot

Documentation contradictions, TokenWatch truth checks, and the email AI provider pivot were reviewed together.

19 April 20262026-04-19 to 2026-04-198 ledger session references
24 April 2026
Post 24Arc 12

Care Profiles Review and Risk Reframing

Care-profile gaps were reframed from simple cleanup into wider truthfulness and risk review.

24 April 20262026-04-24 to 2026-04-255 ledger session references

May 2026

1 May 2026
Post 28Retrospective

The RABS Admin Build in Numbers

The final retrospective reconciles the archive totals, generated posts, handling outcomes, and redaction status.

1 May 20262025-09-27 to 2026-05-01aggregate retrospective metrics