Timeline and searchable index
Explore the generated RABS/admin historical series by date, season, tag, or keyword, with feature arc labels shown on each card. Counts are sourced from the final generation ledger and retrospective.
September 2025
Admin Navigation and User Foundations
Early admin navigation, authentication, user handling, and the first durable shell decisions.
October 2025
Vite Source Admin Rebuild
The admin frontend moved toward source-managed, Vite-built pages without turning into a single-page app.
HR, Reggie, and Admin Frontend Expansion
HR surfaces, Reggie pages, settings modules, and wider admin frontend expansion came into view.
Logging, Notifications, and Settings
Logging, notification delivery, email investigation, and settings reliability became the main friction points.
Profiles, File Manager, and Task System
Profile pages, file-manager repair, task-system expansion, and expense-report direction moved together.
Forum, Email Crisis, and DB2 Cutover
Forum fixes, email instability, communications planning, and the progressive DB2 cutover overlapped.
November 2025
Recovery-Driven Admin and Backdoor Porting
Recovery work, notification repair, and backdoor porting turned failures into a safer migration path.
DB2 Cutover, Calendar Routing, and Email 3.0
DB2 endpoint work, calendar routing, and Email 3.0 planning pushed through resets and partial states.
HR Ops, Contract Hub, Council, and Policy Studio
HR operations, contract flow, council tooling, and policy drafting were shaped as connected work.
December 2025
Admin Directory and Org-Chart Layout
The admin directory and organization-chart layout were grounded in hierarchy, reveal, and asset-serving realities.
Staff Files v2 Backend and Document Flows
Staff file architecture and document workflows were mapped without overstating Monday-sync completion.
Email Ops Monitoring and Dual-Schema Audit
Monitoring, queue visibility, mailbox health, and dual-schema concerns took focus at year end.
February 2026
Type 2 Agents Return
Type 2 agent work returned with broker routes, runtime shape, and the first successful tool-call thread.
Email Agent Routing and Four-Agent Chat Planning
Email-agent routing, switch architecture, prompt upgrades, and four-agent chat planning were tied together.
March 2026
Messenger Fixes and Catch-Up Surveys
Messaging repair, lost-context recovery, catch-up surveys, and KPI workflow expansion framed the period.
File Manager and Media Groundwork
File-manager state, shared asset handling, media foundations, and permission hardening moved forward.
Deputy/Xero Payroll Migration Pivot
Payroll direction pivoted around Deputy, Xero, staff-finance needs, and migration limits.
Finance Billing Worker Batch
Finance and billing frontend surfaces were advanced through an audit-grounded worker batch.
April 2026
TokenWatch, Docs, Scheduling, and Storage-Agent Quality
TokenWatch, documentation cleanup, scheduling work, and storage-agent quality were handled as triage-heavy work.
File Manager, Participant Files, and Type2 Broker Tools
Access control, participant files, payroll-adjacent work, and Type2 broker tools converged in one run.
Mapping the Shift-Note Stack
Shift-note, AI-infrastructure, and UI/schema groundwork were mapped as research rather than shipped completion.
Docs Audit, TokenWatch Reality, and the Email AI Pivot
Documentation contradictions, TokenWatch truth checks, and the email AI provider pivot were reviewed together.
Core Engine Rethreading, YP3000, POS Reality Checks, and Timeout Handling
Core-engine alignment, YP3000 groundwork, POS audits, and timeout handling were treated as systems alignment.
Care Profiles Review and Risk Reframing
Care-profile gaps were reframed from simple cleanup into wider truthfulness and risk review.
Review Missions, Agent Runner Reality, and Follow-Up Fixes
Review missions, runner behavior, and narrow follow-up fixes kept the day correction-focused.
Cleanup, TokenWatch Debugging, and Security-Post Synthesis
Cleanup, TokenWatch diagnosis, model-audit context, and a deliberately small public security post were connected.
May 2026
OpenClaw Recovery Planning and Config-Control Groundwork
OpenClaw recovery and config-control work were framed as recovery-first planning, not completed restoration.
The RABS Admin Build in Numbers
The final retrospective reconciles the archive totals, generated posts, handling outcomes, and redaction status.